Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 24, 2019     8-3 step 3 HS Elevator attachment bracket fabrication - (2 hours) Category: Tail Feathers
cut from AA6-187X2X2-1/2 angle two parts
Drilled 1/8"" hole in the indicated position.
Trimmed to measure.
Drilled 3/16"" holes
Radius all corners 1/8"".
After mounting and matchdrilling the holes are right at the limit to the edge.
After consultation with Lucio Castrogiovanni it seems that the fabrication is acceptable.
As i ordered other angles from VANS i consider to refabricate the brackets.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.